SEE MORE:
The flange/driveshaft used before must be installed.
If the flange/driveshaft is also being replaced, do the
following. Refer to
→ Chapter "Flange Shaft Ring, Replacing, 0BD".
Special tools and workshop equipment
required
Puller - Multiple Use -VW391-
Slide Hammer Set -VW771-
Slide
Special tools and workshop equipment
required
Torque Wrench 1332 40-200Nm -VAG1332 -
Piston Resetting Tool -T10145-
Socket - Xzn 9 -T50036 -
Note
If old brake pads are being replaced with new ones, then it is necessary to
check the brake rotor for wear. Pay attention to the brake roto