Audi Q5: Refrigerant Circuit, Checking Pressure with Service Station
READ NEXT:
Note
All test conditions marked * are vehicle-specific and are
described in the Repair Manual for the relevant vehicle.
Check cooling performance.
Connections with valve and service conne
Observe the test requirements. Refer to
→ Chapter "Test Requirements".
- Turn off the ignition.
- Connect the A/C service station. Refer to
→ Chapter "A/C Service Station,
General Information
Note
Connect the A/C service station. Refer to
→ Chapter "A/C Service Station, Connecting".
Observe the test requirements. Refer to
→ Chapter "Pressures,
SEE MORE:
1 - Subframe
Removing and installing. Refer to
→ Chapter "Subframe, Removing and Installing".
2 - Bolt
9 Nm
3 - Bolt
20 Nm
4 - Subframe Shield
Installed depending on the engine versions
Removing and installing. Refer to
→ Chapter "
Gap Cover, Removing and Installing, Vehicles without a Retaining Track
Removing
- Remove the front luggage compartment floor. Refer to
→ Chapter "Luggage Compartment Floor, Removing and Installing,
Non-Hybrid Vehicles".
- Remove the dirt shield, if applicable.
- Remove the tie