Audi Q5: Hood, Lids
READ NEXT:
1 - Hood
A second technician is needed to support and hold the hood during
removal and installation.
Removing:
Remove the gas-filled strut from the hood. Refer to
→ Chapter "
Special tools and workshop equipment
required
Gauge - Gap Adjustment -3371-
Hood Gap Dimensions
Dimension -A- = 5.0 mm
Dimension -B- = 4.5 mm
Dimension -C-= 5.0 mm
Dimension -D- = 3.0 mm
Di
1 - Gas-Filled Strut
Noise insulation component must be installed on the body side.
2 - Rear Lid Hinge
Removing. Refer to
→ Chapter "Hinges, Removing and Installing".
SEE MORE:
Connector Assignments
CD Changer -R41- Connector Assignment, MMI
CD Changer -R41-
A - Black 8-pin connector (T8aa)
B - MOST Bus
Note
Unlisted connector terminals are not assigned.
A - Black 8-pin connector (T8aa)
1 - Terminal 31
2 - Terminal 30
3 
Approved Refrigerant Oils and Capacities
Note
As PAG (polyalkylene glycol) oil is highly hygroscopic
(attracts water), opened containers are to be immediately
resealed so as to be air-tight.
PAG oil from containers which have been open for a lengthy
period is no longer usable.
Refrige